Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

New Construction Water, Sewer, New Exclusion Meter, and/or Utility Kills

  1. PublicWorks

  2. exclusion meter

  3. Set meter 7-31

  4. Utilities Needed*

    Please select the utilities needed.

  5. Please upload a signed request, by property owner to kill utilities (Water and/or Sewer). Please specify if the kill needs to be permanent or temporary. You will receive a bill for actual cost for temporary kills. (No cost for permanent kills).

  6. House #, Apt/Suite, Street, State, Zip Code

  7. Once Service Is Set, A Utility Bill Will Be Generated and Sent To The Following Address

  8. House #, Apt/Suite, Street, State, Zip Code

  9. Availability Costs For A 5/8-inch Meter (Larger Services See DOMESTIC METER SIZING FORM to Determine Size and Fees)

    Water Facility Fee: $2,725.00 Sewer Facility Fee: $4,250.00 Cost of Meter/Transmitter: $253.00 Water Tap Fee: $800.00 (Minimum with Actual Cost Balance Billed Upon Completion) Sewer Tap Fee: $800.00 (Minimum with Actual Cost Balance Billed Upon Completion)

  10. Upload your filled out meter form here (if applicable).

  11. Please Type Additional Comments Here.

  12. By Entering First and Last Name, You Agree To Be Invoiced For Tap Installation, Facility Fees, and/or Cost of Meter

  13. Leave This Blank:

  14. This field is not part of the form submission.